Bylt: Real Time Construction News & Market Data
Construction Everyday. Real Time News and AEC Industry Market Data. Powerful News For The Architectural, Engineering & Construction Industries.

Bids & Proposals

Bids & Proposals

Upper Providence Township, Montgomery County will receive sealed bids online for the 2021 Upper Providence Township Roads Paving Project “Bâ€?. Sealed bids may be submitted and updated online via the PennBid™ Program until 11:00 A.M. local time, Wednesday, May 12, 2021. The project includes providing all labor, equipment and materials to complete the installation of an asphalt pavement overlay of approximately 25,000 square yards of Superpave Asphalt Mix Design, Wearing Course 9.5 mm Mix to a 1-1/2â€? depth, milling the existing surface to a depth of 1-1/2â€?, pavement base repairs, replacement of sanitary sewer manhole frames and covers, replacement of inlet top units, removal and replacement of plain cement concrete curb, installation of pavement line striping and pavement markings and miscellaneous work on Pichelman Road, Grasshopper Lane, Dorothy Circle, N. Mennonite Road, Tara Drive and Norwood Street. The project will also include providing all, labor, equipment and materials to remove and replace plain cement concrete curb at ADA/PennDOT compliant curb ramps, to remove and replace concrete ADA/PennDOT compliant curb ramps and to install ADA compliant detectable warning surfaces. All Bid Documents and solicitation details are available at no cost at PennBid™ – pennbid.procureware.com. Click on the “Solicitationsâ€? then “Viewâ€? tabs. Please note the low bidder is responsible for a fee to PennBid™. Each bid must be accompanied by a bid bond or a certified check in an amount not less than ten percent (10%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. No bid may be withdrawn for the period of days stated in the bid form from the date the bids are opened. The successful bidder will be required to furnish satisfactory Performance and Payment Bonds in the amount of 100% of the Contract amount and a Maintenance Bond in the amount equal to fifteen percent (15%) of the contract amount, thereafter required on the specified Bond Forms included in the Contract Documents and Waiver of Lien. The right is reserved to waive any informality in the Bid, to reject any or all Bids, and to accept any Bid which is deemed most favorable to the Owner, at the time and under the circumstances stipulated. The work in this contract shall be paid for in accordance with the Pennsylvania Prevailing Wage Act (Act No. 442) UPPER PROVIDENCE TOWNSHIP MERC April 21, 28 a-1

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Hi!

This feature is in BETA.

Wanna try?

Join the wait list or be the first to know when its live to the public.

You have successfully joined!

There was an error while trying to send your request. Please try again.

bylt will use the information you provide on this form to be in touch with you and to provide updates and marketing.