Call Toll Free +1 855-856-TIPS
Sealed proposals will be received by: Orange Township of Columbia County, PA, at 2028 State Route 487 Orangeville, PA 17859 until 4:30 PM, on August 5, 2021 to be opened on August 5, 2021 at 7:30 PM at 2028 State Route 487 Orangeville, PA 17859
For the following:
FDR/ Paving Project Contract:
Perform approximately: 5156 SY of FDR-Mechanical Stabilization, incorporating approx. 250 ton of 2B Stone, furnish and place approx. 928 Ton of 19mm Asphalt Binder Course-Fine Graded, and approx. 145 ton of 2A Subbase for shoulder backup. Mandatory pre-bid meeting will be held at project location (Kline Road/Trump Road intersection) on July 28, 2021 at 9:00 am. Call 570-683-5836 or email
orangetwp@
pa.metrocast.net
(email preferred) to obtain a copy of bid documents. Bid Bond in the amount of 10% of the contracts is required of all bidders. Performance bond and payment bond in the amount of 100% of the contract, as well as proof of worker’s compensation insurance will be required from the lowest responsible bidder. All work and material must meet current Pennsylvania Department of Transportation Specifications Form 408 and its Supplements. Proposals must be upon the forms furnished by the Municipality. The Municipality reserves the right to reject any or all proposals.
Orange Township